
Oilfield services
Welding, Fabrication & Surface Facilities
Code-qualified welding and construction of surface facilities: fabrication, repair, assembly and dismantling.
- Afloat & onshore
- ASME / API qualified procedures
Scope of work
We offer two types of work: new fabrication, built from raw stock to an approved drawing, and repair or replacement of existing installations with certified commercial material. Cutting, dismantling and cleaning services complete the offering. Every job runs with a basic crew of 2 welders and 2 helpers, a portable diesel welding machine, oxy-fuel cutting equipment and a compressor.

AFabrication of new parts & components
- Wells & equipment
- Wellhead protectors; anti-theft guards for wellheads, valves and equipment; skids for chemical pumps and slickline units; lubricator supports; baskets and lifting structures.
- Platforms & structures
- New handrails, stairs, walkways and gratings; fenders and berths; pipe supports; new bracing and reinforcements.
- Stations & locations
- Small tanks, containment boxes and drip trays; stacks, vents and flares; fences, gates and steel sheds.
- Custom piping
- Spools and nipples; clamps for subsea line repair (diver installed).
- Workshop
- Steel parts and structures to order.
Requirements
Client-approved drawing, material take-off, workshop, dimensional control and anticorrosive protection.
BRepair & replacement with commercial material
- Lines & piping
- Leak repair with section replacement; type A and B reinforcement sleeves; gas lift lines; discharge lines at stations and manifolds; welding and installation of flanges, elbows, tees, reducers and valves.
- Platforms
- Repair of existing handrails, stairs, walkways and gratings; bracing and supports over water; replacement of welded anodes over water.
- Wells & equipment
- Pumpjack bases and structures; casing extensions and weldable wellheads, per qualified and manufacturer procedures.
- Tanks & surface equipment
- Tank patches, nozzles and stairs; out-of-service separators and scrubbers; existing stacks, vents and flares.
Requirements
Prior inspection (thickness, failure location), qualified WPS, hot-work permit, certified material and, where applicable, NDT and hydrostatic testing.
CDismantling, cutting & debris removal
- Cutting and dismantling of out-of-service structures, equipment and lines
- Cutting of piles and pipes over water
- Air-arc gouging to remove defective welds
- Surface cleaning and preparation (pneumatic tools or blasting)
- Line blowing and drying
- Scrap recovery and transfer to the client's yard
Plan your next well intervention with us
Combine services under a single contract and a single point of contact.
